
We make, document, report and communicate objective engineering observations on construction contract compliance and non-compliance to assure project quality.
Showcase Projects

Freeway 55 Widening from I5 to I405
Analyzer's role as Assistant Structure Representative with responsibilities to review submittals, respond to RFI and perform inspection on pile driving, CIDH pile installation and mitigation, shoring installation, and precast concrete girder placement.

I80 Gilman Pedestrian Overcrossing Interchange
Analyzer's role as Structure Representative with responsibilities to review and authorize submittals, calculate and verify bridge grades, respond to RFI, attend progress and management meetings, supervise 2 structure inspectors, interact with designers to resolve constructability issues, interact with Caltrans falsework reviewers to resolve issues and expedite reviews, and perform inspection on CIDH coring and mitigation.
Environmentally Friendly
Yuba River Side Hills Viaducts, Route 49 – Analyzer’s role as sole roadway and structure inspector working in the pristine Tahoe Forest.
Welcome Aboard Our Project Tours
- Interchanges
- Grade Separations
- Freeway and Bridge widenings
- Bridge rehabilitations
- Overhead Sign Structures
- Caltrans Maintenance Stations






